Project

María – S. Teresa – Hydroelectrical bridge Machupicchu, Road in Peru

Client:
Provias Nacional
Date:
2013-2015
Location:
Machupicchu, Perú
Services:
Engineering Design
Key disciplines:
Motorways and Roads
Road Engineering
Bridges

We have performed the upgrade of “Santa María – Santa Teresa – Hydro Electrical bridge Machupicchu” road in Peru. Preliminary design of this 33km-long road includes 920m-long and 1140m-long tunnels, as well as 6 new bridges.

<< Back